Gustavus Case Study

The Challenges


  1. (click photo to enlarge)
    Provide immediate temporary roofing solutions to minimize damage to the 59 campus buildings damaged by the tornadoes.
  2. Assess structural integrity, secure building contents and prioritize the production schedule for all 59 damaged buildings.
  3. Meet and exceed previous roofing systems quality and functionality, while maintaining a very aggressive production schedule.
  4. Maintain manpower and appropriate staffing for the duration of the repair cycle (109 days total).
  5. Attempt and complete 445,270 square feet of roofing that not only met the production deadline, but also received a “Perfect 10 rating” from Carlisle SynTec Systems.