| Gustavus Case
Study
| The
Challenges |
 |
-
Provide immediate temporary roofing solutions to minimize
damage to the 59 campus buildings damaged by the tornadoes.
- Assess structural integrity, secure
building contents and prioritize the production schedule
for all 59 damaged buildings.
- Meet and exceed previous roofing
systems quality and functionality, while maintaining
a very aggressive production schedule.
- Maintain manpower and appropriate
staffing for the duration of the repair cycle (109
days total).
- Attempt and complete 445,270 square
feet of roofing that not only met the production deadline,
but also received a Perfect 10 rating
from Carlisle SynTec Systems.